Southwest Gas

Project Summary

Black Scale Inc. was contracted by Southwest Gas in Safford, AZ, to complete the installation of three bathrooms within their facility. The project focused on creating functional, compliant, and aesthetically pleasing restrooms equipped with high-quality accessories to meet both ADA standards and the client’s specific needs.

Key Project Elements

  1. Bathroom Partitions:
    • Installed durable, high-quality partitions in each bathroom. The partitions were chosen for their resistance to wear and tear, ensuring long-term durability in a high-traffic environment.
    • The design also focused on privacy and ease of maintenance.
  2. ADA Compliant Accessories:
    • Grab Bars: Installed grab bars at ADA-compliant heights in all bathrooms to ensure accessibility and safety for all users.
    • Mirrors: Mounted mirrors at ADA-specified heights, ensuring they are accessible for individuals in wheelchairs.
    • Toilet Paper Dispensers: Positioned dispensers at 15-19 inches above the floor and within the required 7-9 inches from the toilet, as per ADA regulations.
  3. Additional Accessories:
    • Installed soap dispensers, paper towel dispensers, and hand dryers at accessible heights to ensure ease of use for all individuals.
    • Feminine hygiene product dispensers and sanitary napkin disposal units were also installed, with a focus on user convenience and compliance with accessibility guidelines.

Challenges and Solutions

  • Challenge: Limited space in some of the bathrooms required careful planning to ensure ADA compliance without compromising functionality.
    • Solution: Our team worked closely with the client to customize the layout of each bathroom, ensuring all accessories were strategically placed to maximize space while adhering to ADA standards.
  • Challenge: Coordinating the installation with ongoing operations at Southwest Gas.
    • Solution: We executed the project in phases, minimizing disruptions and ensuring that the facility remained operational throughout the construction period.

Results

The project was completed on time and within budget, with all bathrooms meeting the client’s expectations for quality and ADA compliance. The new installations have significantly enhanced the functionality and accessibility of the facilities at Southwest Gas, providing a better experience for both employees and visitors.